Collaboration With 3D BIM Models (english)

Profiled Firm: IttenBrechbühl

Location: Basel, Switzerland

Beteiligte Nemetschek Marke: Vectorworks

When you meet architectural office and general contractor IttenBrechbühl AG, you’ll find approximately 320 employees who are able to realize large and complex buildings from basic design to commissioning. With over 300 hospitals built worldwide, IttenBrechbühl is particularly strong in the healthcare sector, but also in other sectors such as education and research, transport, and industrial services. The office has a total of 11 locations based in Switzerland, Germany, and Luxembourg.

In 2016, IttenBrechbühl won the Arc Award BIM in Gold with the construction of the large-scale research facility SwissFEL of the Paul Scherrer Institute. A year later, the firm repeated this success with the headquarters of Scott Sports in Givisiez, which is posed to receive the Arc Award BIM in Gold. The sporting goods manufacturer has been based in Fribourg, Switzerland, since 1978. The new company headquarters is poised to represent the innovative power of the company responsible for offering bikes, winter-sports gear, and athletic apparel.

IttenBrechbühl designed the Scott Headquarters with a BIM process similar to other new buildings in Switzerland. IttenBrechbühl gained their first experience with BIM with the SwissFEL, and the aim was similar to the 2016 project: to achieve forward-looking, precise design based on improved communication and coordination between those involved in the process — all on the basis of 3D models. The experience of using BIM for SwissFEL was particularly important for structuring the 3D BIM model at Scott Headquarters: the naming and structure of levels and classes, stories, the definition of the zero point, the handling of IFC data, as well as wall and door styles and symbols used.

Data Exchange via IFC

As with any BIM project, the objectives for Scott Headquarters were initially set out in a project delivery plan. The entire 2D documentation was created with the BIM models; the focus was on quality assurance and interdisciplinary coordination. Model-based quantity takeoffs were also included, with the most important prerequisite being a smooth data exchange. IttenBrechbühl relies on the open file format IFC (SN EN ISO 16739), which can translate data as well as 3D geometry. In order to avoid unexpected surprises, the IttenBrechbühl project team exchanged test files in the IFC format between the different software of the consultants involved, including Basler&Hofmann West AG (HLKS) and Eproplan AG (E), who work with Plancal nova MEP design software, before the actual planning.

As project manager for Scott Headquarters, Tima Kamberi defined the objectives of the BIM planning, supervised the planning process, coordinated the consultants involved and chaired the coordination meetings. Meanwhile, Sandro Ryf and Susanne Keller took over the tasks of BIM coordination — in this capacity they built the 3D architectural model, which served as a reference model for the other models for structural analysis, building services, etc. Ryf sees it as an advantage: with BIM planning, one develops projects in a true material-rich 3D model. This process demands finding spatial solutions for the more complex aspects of the project, which has traditionally been overlooked in 2D sketching. 

"I appreciate the freedom of choice that Vectorworks gives me."
- Sandro Ryf, CAD Systems Administrator at Ittenbrechbühl

"For the 'special corners' I have the possibility to use the general modeling tools of Vectorworks instead of the given parts and to design my own element freely in 3D," Ryf explained.

Ryf therefore does not regard designing with BIM as a restriction of his creativity — it’s actually the contrary. Susanne Keller uses Vectorworks and Solibri Model Checker. She sees a considerable benefit of BIM in checking coordination: "In Solibri Model Checker, our reference model can be merged with the domain-oriented models and checked,” she said. “The automatic collision check provides information for quality improvement. More importantly, I can navigate freely in the project to view critical areas, check recesses, check heights, etc."

In the project development phase, coordination meetings with engineers took place at consistent intervals and were recorded at an early stage. The models, such as the building services model created in Plancal nova and the architectural model created in Vectorworks, were exchanged in IFC format before the meetings so that they could be checked before the meeting. If the architects detected collisions, inconsistencies, or rule violations between their reference model and the model of the engineers, they were logged in Solibri Model Checker in the BIM Collaboration Format (BCF).

BIM has upgraded the work and competence of the draftsman as a whole. Those who model and inform know more about the project than if they drew a 2D plan.”
- SUSANNE KELLER, ASSOCIATE PROJECT MANAGER AT ITTENBRECHBÜHL

The BCF log files record, for example, rule violations together with the affected components, the responsible project teams, an appointment, and suggestions for solving the problem. The IttenBrechbühl team sends the BCF file to the responsible consultant before the coordination meeting, where they all open the BCF file in their respective BIM software. A click on the BCF entry directs the responsible party to the point in the model where the coordination error occurs. For example, if the ventilation shaft and the door collide, he can check possibilities for collision resolution before the meeting, saving valuable collaboration time. The architects and the other participants proceed in the same way with their trades. The session itself then serves to find solutions and decisions. "Instead of problems, everyone goes back to their offices with solutions. This is a great step forward compared to the past, which makes the project more fluid overall," said Keller.

"We consistently apply the BIM method to all our new buildings, because we are convinced that this model of cooperation will become widely accepted.”
- Christoph Arpagaus, Partner and Head of the Bern Office at Ittenbrechbühl

The Benefits of the BIM Process

Marc Pancera, head of BIM at IttenBrechbühl, introduced new internal teams to designing with BIM, which emphasizes the advantages of communication via models — a workflow that avoids misunderstandings that can arise from 2D drawings. "Not only does the time-consuming writing of minutes after meetings go away, but also I notice that both architects and consultants have a higher level of knowledge about the project,” said Pancera. “I attribute this to the fact that problems are solved directly at the meetings and do not have to be examined in the office afterwards."

For Pancera, the BIM method means thinking from the perspective of the entire project team and not just that of the architect. In other words, using BIM via Vectorworks can help enhance IttenBrechbühl's reputation as a key consultant in the planning process.

Pancera then takes these lessons learned a step further by coordinating with BIM experts at authorized Vectorworks distributor ComputerWorks to create internal training courses for project managers and employees.

Christoph Arpagaus, member of the management board, explained how the possibilities of the BIM method can also go beyond 3D design. He sees BIM as a new form of cooperation, in particular project coordination and the exchange of information — two areas in alignment with the goals of the Scott Headquarters BIM project.

With the help of a BIM process, architects at IttenBrechbühl are now re-establishing themselves as directors of a project, holding the threads of the entire planning in their hands with their reference model. This is by no means a question of company size. It is only a question of the know-how and the BIM competence of employees and management, a reality that is certainly attainable.

Verwandte Nachrichten

Assael Pontoon Dock

For Assael Architecture, what started as a humble beginning with two staff members grew into an award-winning practice comprising several teams, directors, associate directors, and managers. With over…

Mehr

The ARP ArchitektenPartnerschaft office is located in Stuttgart with over 80 employees and has been in existence since 1970. Valuing partnership at the core of their thoughts and actions, the firm…

Mehr

From their design approach to their finished projects, the team at Flansburgh Architects doesn’t want to be typical — they want to be better. For over 50 years, the Boston-based firm has led its team…

Mehr

When you meet architectural office and general contractor IttenBrechbühl AG, you’ll find approximately 320 employees who are able to realize large and complex buildings from basic design to…

Mehr

Umweltfreundliches Wohnen verbindet sich mit unverwechselbarem Design

Das Villanova Icône Projekt wurde vom preisgekrönten Architekturbüro Hamonic+Masson & Associés in Paris entworfen. Das…

Mehr

Erstes Museum in Passivhausbauweise

Der Neubau des Kunstmuseums Ravensburg im Süden Deutschlands ist das weltweit erste zertifizierte Museum in Passivhausbauweise und wurde sowohl mit dem Deutschen…

Mehr

Multifunktionelles Gebäude mit Portalfunktion für den Campus

Ein unregelmäßiger Polyeder aus sich überschneidenden Granitebenen wird durch Spalten aus Glas aufgebrochen, um der Sonne den Innenraum zu…

Mehr

Für Hörgenuss sorgt Birnenholz

In der Kulturlandschaft Felsenau liegt das österreichische Feldkirch, dessen Veranstaltungshaus nach Abriss des Vorgängers komplett neu gebaut wurde. Was mit seiner…

Mehr

Ein Wochenendhaus der Extraklasse

Dieses Wochenendhaus für die ganze Familie liegt auf South Pender Island, British Columbia. Das Gebäude misst etwa 750 Quadratmeter und folgt einem einfachen…

Mehr

Revitalizing the Space "Where the Waters Meet"

For the Australian landscape architecture and urban design firm McGregor Coxall, a design has to be more than just a quick solution to a client’s…

Mehr

Die ältesten Nachweise kreativer Intelligenz

Die Schöninger Speere und andere Holzgeräte machen die Fundstelle zu einem weltweit einzigartigen Ort, an dem man erfährt, wie der Homo heidelbergensis…

Mehr

Hausgrundriss orientiert sich an Ackerfurchen

Das vom Architekturbüro LEVENBETTS entworfene Wohnhaus steht in Columbia County in den USA. Geplant mit Vectorworks, fügt sich das moderne, nach strengen…

Mehr

Ein Meilenstein hochalpiner Architektur

Auf 2.883 m über dem Meer liegt die Monte Rosa Hütte, eingebettet zwischen den Gletschern der Walliser Alpen in der Schweiz, wie ein schimmernder Bergkristall.…

Mehr

Paris wächst in den Himmel

Nach mehr als 30 Jahren ermöglicht eine Änderung in der Stadtplanung den Bau des 50 Meter hohen Wohn- und Geschäftshauses ZAC Masséna am linken Ufer der Seine in Paris. Die…

Mehr

While the names Justin Timberlake, Jay Z, Coldplay, Beyoncé, and Britney Spears conjure up images of incredible concert experiences, the lighting designers behind such great shows are often an…

Mehr

For designers at ROJO Architecture, working in a space that's suited for play provides just the right mental break to spark their next great idea. Their office sits inside of what was once a busy…

Mehr

"Grüne Architektur" und Denkmalpflege

Der Campus des Red River College in Winnipeg, Kanada, ist ein modernes Bildungszentrum für Wirtschaft, Multimedia und Informationstechnologie. Das Gebäude wurde…

Mehr
Vectorworks

Sustainability

Auszeichnung mit einem der Environment Top Green Projects Awards

Stillwell Avenue auf Coney Island ist die größte oberirdische Haltestelle im New Yorker U-Bahn-Netz. Für den Neubau dieses wichtigen…

Mehr

1.700 Bäume für ein gutes Klima

Der Sagamihara Campus der Aoyama Gakuin University nahe Tokio umfasst 20 Gebäude auf über 160.000 m² Fläche und bietet Platz für etwa 10.000 Studenten und Lehrkräfte.…

Mehr

Campus Lichtwiese der TU Darmstadt erhält "Deutsches Gütesiegel Nachhaltiges Bauen"

Die TU Darmstadt erhielt für den Neubau des Fachbereichs Bauingenieurwesen auf dem Campus Lichtwiese das "Deutsche…

Mehr

Bowden Centre gewann die angesehensten Architekturpreise Australiens

Das im Februar 2007 fertig gestellte Bowden Centre ist ein neues Bildungs- und Mehrzweckgebäude im Mount Annan Botanic Garden in…

Mehr