57 kilometers right through solid rock

Project: Gotthard Base Tunnel, Switzerland

Engineering consortium: Gähler und Partner AG, Ennetbaden, Switzerland

Building client: AlpTransit Gotthard AG, Lucerne, Switzerland

Photographs: Gähler und Partner AG, Ennetbaden, Switzerland

Nemetschek brand involved: ALLPLAN

With the precision of Swiss clockwork

A project of the century which began in several locations at the end of the 1990s is coming to a close with commissioning planned for December 2016. With a deviation of only 0.00014% – or horizontally by 8 cm and vertically by 1 cm – the five sections of the world’s longest railway tunnel connect to form the fastest route through the Alps. The two single-track tunnel tubes with approximately 180 cross passages were built deep in the heart of the mountain with up to 2,300 m of overlying rock.

The tunnel was excavated using special tunnel boring machines measuring more than 400 m in length, whose cutterheads were 8.80 m in diameter, each fitted with 58 special drills, and blasting agents were used.

The tunnel vault made of cast-in-place concrete has to be at least 30 cm thick in all places in order to be able to withstand the extraordinarily high tension and pressure, with the help of steel arches, concrete reinforcement and sprayed concrete. In addition, it has to allow for movement as a result of the construction of soft sections in which it is possible for the mountain to deform. For this purpose, special steel profiles are used which can be pushed together – similar to shock absorbers. Water that collects in the tunnel is drained off by means of a gutter below the tunnel. The anticipated high temperatures in the mountain make it necessary to ensure a continuous exchange of air. The trains driving through are to have a “piston effect” which will force the air out. If this proves to be insufficient, mechanical ventilation systems will be subsequently installed.

 

Related News

With the precision of Swiss clockwork

A project of the century which began in several locations at the end of the 1990s is coming to a close with commissioning planned for December 2016. With a…

More
Allplan

OMNITURM

Newcomer to the Frankfurt skyline

Frankfurt am Main is known across Europe for its unique skyline. It will soon be enriched by a dazzling tower. The OMNITURM will be built right in the middle of the…

More

Three centuries of bridge building over the Firth of Forth

The Queensferry Crossing near Edinburgh in Scot­land is a cable­stayed bridge with three pylons over 200 m in height. It is one of the…

More

An exciting path across the gorge:
The Tamina Bridge in the canton of St. Gallen

With an arched span of 265 meters, a superstructure length of 417 meters and a height of 220 meters above the valley…

More
Allplan

The Circle

Big, bigger, The Circle

„The Circle“ comes to live 

The biggest high-rise project in Switzerland is becoming a reality: After six years of intense preparation, the end of April 2015 marked the…

More

DIGITAL WORKFLOW ON A MEGA PROJECT

The advantages of the BIM working method are fully exploited during implementation. Stuttgart 21 as a part of the Stuttgart-Ulm rail project is one of the largest…

More

The Advantages of BIM

“Thanks to BIM, we can achieve a very high level of cost accuracy, which we used on the Giessen Tower project for both the preliminary design and construction.” – Matthias Moog,…

More

Rehab unit meets all patient's requirements

Architecture office wörner traxler richter designed an urban novelty in the form of the Health Center of the Tübingen University Clinic: Its extraordinary…

More