Proactive BIM For Big Projects

Profiled Firm: ARP ArchitektenPartnerschaft

Location: Stuttgart, Germany

Beteiligte Nemetschek Marke: Vectorworks

The ARP ArchitektenPartnerschaft office is located in Stuttgart with over 80 employees and has been in existence since 1970. Valuing partnership at the core of their thoughts and actions, the firm determines the level of cooperation with clients, employees, and project teams and uses those relationships to advise project phases and design tasks. Along with project management, they handle all areas related to urban and open space design, as well as architecture and interior design.

The firm uses BIM extensively for various design tasks. They realized it is not crucial for every detail to be designed in 3D; rather, it is important to use a digital design process to facilitate project work and improve work processes. In essence, they are successfully integrating practical BIM.

“With Vectorworks, we can work consistently in one program - from the first stroke to the window detail.”
- Dennis Thumm, Architect at ARP Stuttgart

Adopting Practical BIM Step-by-Step

If the benchmark for BIM is collaboration through the exchange of project information and geometric models across disciplines, ARP has been carrying out BIM for years. Their biggest limitations have been due to project partners (or stakeholders) not yet ready to prepare their data for a shared digital building model.

However, both the Principals and the Associates at ARP wanted to pursue a digitally-driven design process. Their resulting pilot project in 2015, which was partially executed with a BIM process, encouraged the use of BIM in future projects. Since then, every new construction project is set up in 3D, where the building objects also have data; if it is feasible, the design by the MEP and Structural project engineers is also integrated into the model.

Consistent 3D Design is Key

Since the firm is comprised of a variety of different personalities and skillsets, not all teams at ARP work in BIM. “Our Associates range in age between 25 and 65 years old,” said Tobias Hamm, project manager at ARP. “This means a heterogeneous workforce and different levels of competency.”

Nevertheless, ARP uses BIM processes consistently. Burkard Illig, who is one of the CAD/BIM experts for Vectorworks in the office alongside project work, sums it up:

“We are planning most projects with Little BIM, our own in-house BIM, so to speak, but we have also had our first experiences with BIG openBIM,” he said. “In service phases such as conceptual design, documentation, and construction, 3D modeling proves to be very useful. Only some details in the contract documentation are created exclusively as 2D drawings. It doesn’t make sense to model every detail in 3D.”

 “It was always clear that our design software was to be an important working tool,” Tobias Hamm said. “It must be intuitive and logical to operate. In addition, there should be a gain in both time-effectiveness and quality, which is the case with 3D modeling in Vectorworks."

Adding Value to Interactions and Processes

The architects at ARP know from experience that owners only rarely require BIM-based services contractually. In fact, some building or property owners and operators are still unclear about the benefits of model-based design.

With that in mind, ARP take a different, proactive approach. For them, designing using BIM makes sense and improves quality for comprehensive architectural services. The firm generates all plans up to a scale of 1:50 directly from the 3D model. In addition, they make effective use of worksheets and reports in Vectorworks.

If, for example, changes in the door schedule were necessary, without BIM, they had to be manually updated in the contract documentation. This is not necessary for object-based 3D modeling with BIM. Changes are entered

just once in the plan or in the schedule and are automatically updated in all other views of the project — an important benefit that saves a lot of time and stress in everyday office life.

BIM as a Bridge to Understand Projects

One of the projects currently being implemented using the BIM process is the new extension building for Bürkert Fluid Control Systems at its Menden site. A detailed 3D model was created for the workshop building with production-related offices and storage areas. From the outset, the architects created the building in 3D using Vectorworks with intelligent objects to generate sections and perspectives. Once again, the client did not require BIM, but the 3D model proved very helpful in the design phase to help him make decisions about materials and colors. In the production planning, the 3D technical plans for HVAC were also integrated into the plans, which made a collision check possible by visually checking the routing of services.

In another example, 3D design with Vectorworks was primarily used to visualize the extreme terrain differences for a residential building. For the 35 residential units, which will be built in two parts of the building, a height difference of up to 9 meters must be taken into account.

For this purpose, the complete subsoil was modeled on the computer in order to precisely locate and measure both the entrances to the underground car park and the necessary retaining walls and piles for the foundation in the basement. This helped reduce the number of possible discrepancies — and later execution errors. According to ARP, the time invested in this precise 3D modeling in advance pays off during the documentation and construction phases and with fewer problems with the shell.

openBIM: A Worthy Investment

In addition to the in-house BIM at ARP, the architects generally rely on openBIM as their approach to “Big BIM” (shared project data between firms). However, the current situation usually only requires a “little BIM” solution, because the other parties involved in the project are rarely using BIM or are unable to exchange information in the IFC format.

Tobias Hamm also calls on the "informed" client, which he described using this scenario: "The special quality of the services must be explained and the BIM services contractually fixed. In addition, the informed client should define requirements so that together we define the level of detail as well as answer ‘What do I want when?’"

ARP also invests a lot of time in the training and further education of its employees in order to introduce its own architectural office to the challenges of digital planning in the future. In addition to in-house training courses, which are provided by Burkard Illig, program-related Vectorworks training courses are offered by their local Vectorworks partner. In addition, each new employee is trained on the program and the specific project. Four Associates are responsible for CAD and BIM at ARP. They are involved in the projects in the same way as all other employees. This is important for them to support their associates at the best.

“We have developed a specification document that shows exactly which components, classes and layer settings we work with in the project. It is the basis of every new project; it grows and is constantly revised and supplemented,” said Illig. “The template also contains a sample project that can be used at any time to see how the guidelines have been implemented." Project teams usually consist of up to five employees.

An Intelligent and Practical Use of BIM

For ARP, the usefulness of BIM is no longer an issue. For its approximately 80 employees at the two locations in Stuttgart, the critical factor is: Where in the planning and construction process can BIM functions be used for their projects? This does not necessarily mean that BIM must be used in every last detail. Rather, it is important to start using BIM and to realize where the benefits can lie in one's own office and to gain routine. Just take it from Project Manager Tobias Hamm: “The more you do with BIM, the safer you get!”

Images courtesy of ARP ArchitektenPartnerschaft.

Related News

[Translate to english:] Assael Pontoon Dock

For Assael Architecture, what started as a humble beginning with two staff members grew into an award-winning practice comprising several teams, directors, associate directors, and managers. With over…

More

The ARP ArchitektenPartnerschaft office is located in Stuttgart with over 80 employees and has been in existence since 1970. Valuing partnership at the core of their thoughts and actions, the firm…

More

From their design approach to their finished projects, the team at Flansburgh Architects doesn’t want to be typical — they want to be better. For over 50 years, the Boston-based firm has led its team…

More

When you meet architectural office and general contractor IttenBrechbühl AG, you’ll find approximately 320 employees who are able to realize large and complex buildings from basic design to…

More

Eco-friendly living combines with a distinctive design

The Villanova Icône project was designed by the award-winning firm Hamonic+Masson & Associés of Paris, France. This 17-story residential tower…

More

First museum in passive house construction

The new building of the Ravensburg Art Museum in Southern Germany is the world's first certified museum in passive house construction and was awarded with…

More

Multifunctional Building opens Gateway to the Campus

An irregular polyhedron of colliding granite planes is broken by large fissures of glass, opening the interior space to the sun and sending…

More

Lichtwiese Campus of Darmstadt Technical University awarded "The German Sustainable Building Certification"

Darmstadt Technical University was awarded the silver "German Sustainable Building…

More

Revitalizing the Space "Where the Waters Meet"

For the Australian landscape architecture and urban design firm McGregor Coxall, a design has to be more than just a quick solution to a client’s…

More

While the names Justin Timberlake, Jay Z, Coldplay, Beyoncé, and Britney Spears conjure up images of incredible concert experiences, the lighting designers behind such great shows are often an…

More

For designers at ROJO Architecture, working in a space that's suited for play provides just the right mental break to spark their next great idea. Their office sits inside of what was once a busy…

More

Pearwood ensures listening pleasure

The Austrian Feldkirch is nestled in the cultural landscape of Felsenau and is home to an event building which was completely rebuilt after its predecessor was…

More

Building’s floor plan is based on furrows of a ploughed field

The residential home, designed by architecture office LEVENBETTS, is located in upstate New York in the USA. Vectorworks was used to…

More

A luxury-class weekend retreat

This family weekend retreat is located on South Pender Island, BC. The building is approximately 2,500 square feet and contains a simple program—an open social space…

More

The oldest evidence of creative intelligence

The Schöningen spears and other wooden instruments have made the archeological site one of a kind worldwide; a place where one can find out how Homo…

More

A milestone in high alpine architecture

Like a shimmering mountain crystal, the Monte Rosa Hut (Monte-Rosa-Hütte, in German) lies nestled between the glaciers of the Pennine Alps in Switzerland at…

More

Paris is growing skyward

After more than 30 years, a change in municipal planning allows for the construction of the 50 meters tall residential and office building ZAC Masséna on the left bank of the…

More
Vectorworks

Ecologic Campus

"Green" architecture and historic conservation

Red River College Campus is a state-of-the-art business, multi-media, and information technology learning centre. The project was built on a brownfield…

More

Honorable Mention on the Environment Top Ten Green Projects Awards

Coney Island's Stillwell Avenue Terminal is the largest above-ground station in the New York City subway system. For the…

More

1,700 trees for a good climate

The Sagamihara Campus of the Aoyama Gakuin University near Tokyo comprises 20 buildings on an area of more than 160,000 m² and provides space for around 10,000 students…

More

Bowden Centre won Australia's most prestigious architecture awards

The Bowden Centre, completed in February 2007 is a new educational and multipurpose resource building at Mt Annan Botanic Garden,…

More